New Westminster Secondary School heating plant
https://search.heritageburnaby.ca/link/archivedescription95709
- Repository
- City of Burnaby Archives
- Date
- [2001]
- Collection/Fonds
- Burnaby NewsLeader photograph collection
- Description Level
- Item
- Physical Description
- 1 photograph (tiff) : col.
- Scope and Content
- Photograph of a man inspecting a building's heating plant. The man holds a clipboard and looks off into the tubes and pipes in the heating plant.
- Repository
- City of Burnaby Archives
- Date
- [2001]
- Collection/Fonds
- Burnaby NewsLeader photograph collection
- Physical Description
- 1 photograph (tiff) : col.
- Description Level
- Item
- Record No.
- 535-1567
- Access Restriction
- No restrictions
- Reproduction Restriction
- No restrictions
- Accession Number
- 2018-12
- Scope and Content
- Photograph of a man inspecting a building's heating plant. The man holds a clipboard and looks off into the tubes and pipes in the heating plant.
- Subjects
- Buildings - Schools
- Media Type
- Photograph
- Photographer
- Bartel, Mario
- Notes
- Title based on caption
- Collected by editorial for use in a January 2001 issue of the Burnaby NewsLeader
- Caption from metadata: "Mike Marsolais, the heating engineer at New West Secondary School, checks the main heating plant, which has a capacity of 3.6 million btu's."