2 records – page 1 of 1.

Capitol Hill Community Association subseries

https://search.heritageburnaby.ca/link/archivedescription24
Repository
City of Burnaby Archives
Date
1943-1955
Collection/Fonds
Burnaby Historical Society fonds
Description Level
Subseries
Physical Description
Textual records and photographs
Scope and Content
Subseries consists of a photograph of William Dynes, Capitol Hill Community Hall minute book, and architectural plans for the Association's hall.
Repository
City of Burnaby Archives
Date
1943-1955
Collection/Fonds
Burnaby Historical Society fonds
Series
Community Archives Collection series
Subseries
Capitol Hill Community Association subseries
Physical Description
Textual records and photographs
Description Level
Subseries
Access Restriction
No restrictions
Accession Number
BHS1992-12
BHS1992-33
Scope and Content
Subseries consists of a photograph of William Dynes, Capitol Hill Community Hall minute book, and architectural plans for the Association's hall.
History
The Capitol Hall Community Association was formed in 1912, with meetings held in a machine shop located south of Hastings Street. By 1923, the Association had moved to the original Howard Avenue School at Howard and Francis, but the building was destroyed by fire in 1924. A new hall was erected south of Hastings Street in 1926 and was used for Association activities until 1943 when it was also destroyed by fire. From 1943 until late 1947, Capitol Hill Community Association meetings were held in a variety of places, including the United Church Hall, Mrs. Wilson’s house on Ellesmere, Capitol Hill School, Harry Royle’s Store and Mrs. Wood’s house on North Warwick. Various plans and sketches for a new hall were discussed, including one by architect Harold Collerne, but it was turned down. By June of 1944, members decided on the Howard Avenue site on Dynes Park, north of Hastings Street. Two applications for building permits were turned down. In 1946, the Municipal Clerk finally requested tenders for the erection of the hall. In 1947, a "temporary” hall was built on the present site and remains there to this day. Planning and construction was carried out with George Green as Chairman of the Building Committee and William James Dynes as Foreman. The members were in the new hall by December 1947.
Media Type
Textual Record
Photograph
Creator
Capitol Hill Community Association
Notes
Title based on contents of subseries
PC282, MSS077
Less detail

Dominion Bridge Company Limited - Burnaby Plant

https://search.heritageburnaby.ca/link/museumdescription17538
Repository
Burnaby Village Museum
Date
29 Aug. 1957
Collection/Fonds
Burnaby Village Museum Map collection
Description Level
Item
Physical Description
1 plan : col. lithographic print ; 50.5 x 84 cm
Scope and Content
Item consists of a fire insurance plan of the Dominion Bridge Company Burnaby Plant located on the east side of Boundary Road near Lougheed Highway. The plan is in two sheets mounted on a backing board. The buildings are located and colour coded. The plan includes profiles of the buildings. Title o…
Repository
Burnaby Village Museum
Collection/Fonds
Burnaby Village Museum Map collection
Series
Fire Insurance plans of Greater Vancouver and Burnaby series
Description Level
Item
Physical Description
1 plan : col. lithographic print ; 50.5 x 84 cm
Material Details
Scale [1:960]
Scope and Content
Item consists of a fire insurance plan of the Dominion Bridge Company Burnaby Plant located on the east side of Boundary Road near Lougheed Highway. The plan is in two sheets mounted on a backing board. The buildings are located and colour coded. The plan includes profiles of the buildings. Title on plan reads "DOMINION BRIDGE COMPANY, LIMITED / "BURNABY PLANT" / Burnaby, B.C.". The site plan was surveyed by C. L. Schwaab Jr.
History
Dominion Bridge Company was a major enterprise in Burnaby operating from the 1930 until the mid 1970s. Dominion Bridge constructed steel structures ranging from portions of the Golden Gate and Lions Gate Bridges to holding tanks for pulp mills. Beginning in the mid-1970s, unused areas of the site were used for filming on a temporary basis and in 1987 the site was established as a dedicated studio production facility named Bridge Studios.
Creator
Schwabb, C.L. Jr.
Subjects
Buildings - Industrial - Factories
Names
Dominion Bridge Company
Responsibility
Associated Factory Mutual Fire Insurance Cos
Geographic Access
Boundary Road
Street Address
2400 Boundary Road
Accession Code
BV015.10.1
Access Restriction
Restricted access
Reproduction Restriction
May be restricted by third party rights
Date
29 Aug. 1957
Media Type
Cartographic Material
Historic Neighbourhood
Broadview (Historic Neighbourhood)
Planning Study Area
West Central Valley Area
Scan Resolution
400
Scan Date
2021-11-28
Notes
Title based on contents of plan
Scale on plan reads "1 inch = 80 ft / By V. Pitkin"
Identfication information in bottom right corner of plan reads: "FACTORY MUTUAL ENGINEERING DIVISION / Associated Factory Mutual Fire Insurance Cos. / Norwood, Mass. / SERIAl 47330 / Replacing 35238 / INDEX 3994"
Less detail